Keeping you informed

Installation of Solar Panels and support Structures

REQUEST FOR EXPRESSION OF INTEREST

Ivanplats (Pty) Ltd is issuing this Request for Expressions of Interest to attract interested suppliers from the Mokopane Community to participate in the tendering process as the main Contractor on the following package:

PACKAGE NUMBER PACKAGE DESCRIPTION
IVH-PLR-22-0928 Installation of Solar Panels and support Structures, supply and install of Aux equipment, Cabling and Commissioning

 

  1. General Description of the Works

Platreef is installing a PV plant on a 5ha area. An installation contractor is required to do the supervision, installation of the structures, panels and inverter station as well as the commissioning of the solar panel infrastructure.

The contractor will also supply intelligent string combiner boxes, DC and AC cabling and conduit, cable racks, communication cable/fibre and earthing material.

Install solar Panels and support structures:

  • Structures, Panels and Inverter station will be free issued.
  • It will be required by the contractor to:
    • Do some clearing of +- 5ha area – only shrubs and obstructive vegetation will be removed
    • No earthworks are required to level ground (other than at Inverter Station) – existing soil profile to be utilised as is.
    • Trenching and backfilling to specified standards.
    • Ramming and/or drilling with concrete foundations will be used depending on soil conditions.
    • No fence around PV Plant required – a Clearview fence and gate will only be installed around the Inverter Station
    • No road construction or grading is required – construction vehicles will establish internal roads by normal movement
    • No design services are required and will be issued.

MV Substation

Supply and install a new 11kV outdoor feeder/incomer bay in the existing MV Substation.

 

  1. SCALE OR WORKS and TIME FRAME:

The construction starting date will be determined by the planned delivery date of the structures, currently planned to be begin November 2023.

PV Panel and Inverter Station installation currently planned for April 2023

Below table provides a high-level overview of major estimated construction quantities to give an indication of the scale of works required – may vary from final design:

1 PV modules
  Install and Commission PV Modules qty.     8 960
2 Module mounting structure
  Install of Mounting Structures (32m ea) qty.   160
  Rear and Front piles (Ramming/Drilling) qty.   3 520
  Supply and Install Combiner Box Mounting Structures qty.   20
3 Power station
  Power Station foundations and Fencing Lot.            1
4 String Combiner Box (SCB)
Supply and Install SCB and associated RS485 interconnection comms cables qty.     20
5 DC cable
  1C x 6 sqmm, m 10 600
  1C x 400 sqmm, m     9200
6 Conduit for SMB
40mm dia HDPE Double Wall Corrugated (DWC) conduit m 1 500
7 Trenching
  DC cable trenching 6 sqmm, 1000mm deep m 500
  DC cable trenching 400 sqmm, 1000mm deep m   1700
8 MV Substation
  11KV MV Outdoor Incomer/Feeder Lot 1
9 Consumables
  Consumables Lot 1
  Multimode Fiber m 2000

 

Below table is a preliminary high-level time frame on the above estimated works:

DESCRIPTION START END
Install of Structures on Site Begin Nov 2023 End Feb 2023
Install of PV Panels, Combiner Boxes Begin March 2023 End May 2023
Commissioning Jul 2023 Jul 2023

 

  1. MINIMUM REQUIREMENTS

The following are minimum requirements for the main Contractor position on this package:

  • Good project execution track record based on similar construction related services previously rendered.
  • Good track record based on compliance to the Mine Health and Safety Act and safety achievements in similar contracts executed.
  • Must have a well-established safety management system.
  • Must have a quality manage system that is based on the principles of ISO 9001. Detailed quality control plans for all associated civil construction works.
  • Written confirmation that the Contractor is not under any liquidity or legal confinements that may affect the performance and deliverance of any contract.
  • Must have knowledge and experience with project-, cost- and schedule management with associated software.
  • Survey and setting out capabilities for intricate civil construction works.
  • Detailed material take-off and estimating capabilities.
  • Must demonstrate that they have a proper understanding of resourcing similar related construction works.
  • Must be able to develop a detailed, resource loaded, construction schedule in preferably Primavera P6 or alternatively MS Project. Must be able to demonstrate that they have a good track record in achieving project completion dates.
  • Licensed fabrication area with tools.
  • Skilled artisans for the installation of the equipment.

 

  1. RESPONDING TO THE EXPRESSION OF INTEREST

Information given by the prospective Contractors shall be treated in strict confidence.

Note, this Request for Expressions of Interest does not amount to any contractual obligation on the part of Ivanplats, and that Ivanplats is not obliged to invite Requests for Proposal or Tenders from any or all who express interest by responding to this Request for Expressions of Interest.

Ivanplats reserve the right to cancel, suspend or withdraw the Request for Expressions of Interest process at any time and will not be responsible for any costs incurred by potential Contractors. The prospective Contractor is responsible for all cost associated with preparation and submission of their Expression of Interest.

If any criteria within the Expression of Interest submission is determined to be non-compliant, the submission will not be processed. If, however, the Contractor declares its non-compliance and offers an alternative solution that is acceptable, this may be considered. Any information and/or documentation given and later found to be incorrect shall lead to disqualification of the prospective Contractor.

This document does not entail or imply any commitment on the part of Ivanplats, either financial or otherwise, nor shall it be considered a specific invitation to tender. This does not represent or constitute any obligation or commitment of Ivanplats to enter into any agreement with any entity or organisation.

Canvassing will lead to automatic disqualification of the prospective Contractor.

 

 

PACKAGE: ___________________

Expression of Interest Letter and Checklist

THIS IS NOT A REQUEST FOR TENDER OR PROPOSAL. PLEASE DO NOT SUBMIT ANY PRICES AT THIS STAGE.

 

Closing Date: 07 October 2022

Please submit Expressions of Interest and all supporting documentation to the Tender Box at X1 at the Ivanplats Mine Security.

Late submission will not be acceptable. Any application(s) received after the closing date will be considered as late and disqualified.

If required, please contact the following:

ivanplatsprocurement@ivanplats.com

 

CONTRACTOR INFORMATION
Company or Individual Name:
Shareholders/Members Details:
Community:
Contact Number:
Emails Address:

 

Minimum attachments required as part this Expression of Interest submission:

DOCUMENTATION CHECKLIST ATTACHED

[YES/NO]

Completed and Signed Letter/Expression of Interest
Certified ID Copies of All Shareholders/Members
Proof of Residence of Shareholders/Members
Company Registration Documents (CIPC Documentation)
Tax Clearance Certificate
Letter of Good Standing
B-BBEE Certificate
Proof of Audited/Reviewed Financial Statements
Company Profile
Company Organogram
List of Similar Experience including References
Company Safety Management Plan and Policy
Company Safety Statistics (Summary)
Company Quality Management Plan and Policy
List of Equipment and Proof of Ownership (Earthworks Machinery)
Confirmation of Insurances

I confirm that I am interested in submitting a tender and attending a future tender briefing session to be held by Ivanplats.

 

_______________________       _______________________     __________________

Name                                                       Signature                                      Date

* This Expression of Interest does not amount to any contractual obligation on the part of Ivanplats. Ivanplats is not obliged to invite Requests for Proposal or Tenders from any or all who express interest by submitting this Expression of Interest.

PV Plant EOI – October 2022